276°
Posted 20 hours ago

Bottega Veneta BV1103S Black/Grey 54/20/145 unisex Sunglasses

£9.9£99Clearance
ZTS2023's avatar
Shared by
ZTS2023
Joined in 2023
82
63

About this deal

means that configurations are different (e.g. Config B * Config C means that a different configuration is used for the Class B testing than for the Class C testing). The test apparatus and procedure shall be as described in EN 60068-2-6, Test Fc, and as described in 6.13.2.2 to 6.13.2.5.

Because it is not practical to make tests with very slow increases in smoke density, an assessment of the detector’s response to slow increases in smoke density shall be made by analysis of the circuit/software, and/or physical tests and simulations. a) where the volumetric flow is not maintained constant, the increase and decrease in flow shall be verified as follows: NOTE The stability of the air and temperature affects the smoke flow within the room. This is particularly important for the test fires which produce low thermal lift for the smoke (e.g. TF2 and TF3). It is therefore recommended that the difference between the temperature near the floor and the ceiling is < 2 °CC, and that local heat sources that can cause convection currents (e.g. lights and heaters) should be avoided. If it is necessary for people to be in the room at the beginning of the test fire they should leave as soon as possible, taking care to produce the minimum disturbance to the air. The aspirating smoke detector shall generate an alarm signal, in each test fire, before a time Tt after the specified end of test condition is reached where the correction time Tt is the transport time for the sampling point(s) in the fire test room up to a maximum of 60 s.

The specimen shall be mounted on a rigid fixture as described in 6.1.3 and shall be connected to its supply and monitoring equipment as described in 6.1.2.

The detector may provide for connections to ancillary devices (e.g. remote indicators, control relays), but open- or short-circuit failures of these connections shall not prevent the correct operation of the detector. smoke detector, in which air and aerosols are drawn through a sampling device and carried to one or more smoke sensing elements by an integral aspirator (e.g. fan or pump) b) it shall be possible to determine what sensitivity settings have been selected and to relate these to documentation which describes the sensitivity settings required for different sampling devices and applications; The vibration shall be applied in each of three mutually perpendicular axes, in turn, the specimen shall be mounted so that one of the three axes is perpendicular to its normal mounting plane.The specimen shall be mounted as described in 6.1.3. It shall not be supplied with power during the conditioning, but it may have untinned copper wires, of the appropriate diameter, connected to sufficient terminals, to allow the final measurement to be made, without making further connections to the specimen. The ratio of the response threshold values Nmax : Nmin shall not be greater than 1,6. 6.8 Damp heat, steady state (endurance) In accordance with the requirement in 5.9.2, when testing of the air flow monitoring facility is required it shall be tested as follows: The ratio of the response threshold values Nmax : Nmin shall not be greater than 1,6. 6.13 Vibration, sinusoidal (endurance)

The details of the supply and monitoring equipment and the alarm criteria used shall be given in the test report. We show the gps coordinates in different format, so that it is compatible with other tools that you may wish to use.The ratio of the response threshold values Nmax: Nmin shall not be greater than 1,6. 6.6 Cold (operational) Repeat the process subtracting the smaller number from the result until the result is smaller than the original small number. The ratio of the response threshold values Nmax : Nmean shall not be greater than 1,33. The ratio of the response threshold values Nmean : Nmin shall not be greater than 1,5. The ratio of the response threshold values Nmax : Nmin shall not be greater than 1,6. 6.11 Impact (operational) No alarm or fault signals shall be given during the period that the temperature is increasing to the conditioning temperature or during the conditioning period, except as required by the tests in the last hour.

Another way to get your gps coordinates is to get our free gps coordinate app on Android. The app will get your gps coordinates upon opening. NOTE The vibration operational and endurance tests may be combined such that the specimen is subjected to the operational test conditioning followed by the endurance test conditioning in one axis before changing to the next axis. Only one initial and one final measurement need then be made. The sampling pipes and fittings shall have adequate mechanical strength and temperature resistance. The minimum requirement shall be:The specimen shall be mounted as described in 6.1.3 to a rigid structure, as required by EN 60068-2¬75, and shall be connected to its supply and monitoring equipment as described in 6.1.2. About BoschSince the humble beginnings in Stuttgart, 1886, when Robert Bosch formed his own business manufacturing electronic components, the ‘Workshop for Precision Mechanics and Electrical Engineering' has become one of the biggest and best known manufacturers of domestic and industrial electrical products in the world. The willingness to improve on established designs started almost immediately and it is this ethos that has kept Bosch GmbH and Bosch lawnmowers ahead of their rivals ever since. This innovation is quite apparent in the present range of Bosch lawnmowers and garden products that include tools no other garden machinery manufacturer produces. Musk first disclosed his stake in the social media giant on April 4. He later landed a seat on the company's board of directors before reversing those plans. The aerosol concentration shall then be increased at an appropriate rate, depending upon the detector’s sensitivity. The rate of increase in aerosol density shall be similar for all measurements on a particular detector type. It is recommended that the alarm signal is generated between 2 min and 10 min after the start of the measurement. Preliminary testing may be necessary to determine the appropriate rate for a particular detector type.

Asda Great Deal

Free UK shipping. 15 day free returns.
Community Updates
*So you can easily identify outgoing links on our site, we've marked them with an "*" symbol. Links on our site are monetised, but this never affects which deals get posted. Find more info in our FAQs and About Us page.
New Comment